{"id":2262,"date":"2019-09-09T11:13:16","date_gmt":"2019-09-09T09:13:16","guid":{"rendered":"https:\/\/www.haasetank.de\/?post_type=reference&#038;p=2262"},"modified":"2020-05-18T09:39:58","modified_gmt":"2020-05-18T07:39:58","slug":"retention-basin-recovered-with-grp-lining","status":"publish","type":"reference","link":"https:\/\/www.haasetank.de\/en\/references\/retention-basin-recovered-with-grp-lining\/","title":{"rendered":"Retention basin recovered with GRP lining"},"content":{"rendered":"\n<p>A retention basin, in which rain and surface water is to be collected, was completely lined with GRP laminates from Haase. Both the price and the durability of the material were decisive for the customer&#8217;s decision.<\/p>\n\n\n\n<p>The approx. 186 m\u00b2 laminate was manufactured in the Gro\u00dfr\u00f6hrsdorf plant, assembled to the correct size and then wound up as rolls. The transport to the construction site was not a problem. The GRP panels were anchored to the concrete and then all joints and panel transitions were overlaminated in a liquid-tight manner. This technology also enabled the absolutely tight connection of a DN250 inlet pipe using a GRP pipe socket and a rubber press seal. Finally, a UV-resistant protective coating was applied.<\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_01.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_01-1024x768.jpg\" alt=\"The inlet pipe is permanently tightly sealed after lamination.\" data-id=\"2264\" data-full-url=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_01.jpg\" data-link=\"https:\/\/www.haasetank.de\/en\/references\/retention-basin-recovered-with-grp-lining\/retention_basin_recovered_with_grp_lining_01\/\" class=\"wp-image-2264\" srcset=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_01-1024x768.jpg 1024w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_01-300x225.jpg 300w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_01-768x576.jpg 768w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_01-1536x1152.jpg 1536w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_01.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">The inlet pipe is permanently tightly sealed after lamination.<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_03.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_03-768x1024.jpg\" alt=\"The laminate panels were assembled in the factory, wound on rolls and brought to the construction site.\" data-id=\"4313\" data-full-url=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_03.jpg\" data-link=\"https:\/\/www.haasetank.de\/en\/references\/retention-basin-recovered-with-grp-lining\/retention_basin_recovered_with_grp_lining_03\/\" class=\"wp-image-4313\" srcset=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_03-768x1024.jpg 768w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_03-225x300.jpg 225w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_03-1152x1536.jpg 1152w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_03.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">The laminate panels were assembled in the factory, wound on rolls and brought to the construction site.<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><a href=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_02.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_02-1024x768.jpg\" alt=\"A protective coating was applied to the GRP laminate. The GRP lining for the rainwater retention basin has a surface area of 186 m\u00b2.\" data-id=\"2265\" data-full-url=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_02.jpg\" data-link=\"https:\/\/www.haasetank.de\/en\/references\/retention-basin-recovered-with-grp-lining\/retention_basin_recovered_with_grp_lining_02\/\" class=\"wp-image-2265\" srcset=\"https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_02-1024x768.jpg 1024w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_02-300x225.jpg 300w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_02-768x576.jpg 768w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_02-1536x1152.jpg 1536w, https:\/\/www.haasetank.de\/app\/uploads\/sites\/2\/2019\/09\/Retention_basin_recovered_with_GRP_lining_02.jpg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"blocks-gallery-item__caption\">A protective coating was applied to the GRP laminate. The GRP lining for the rainwater retention basin has a surface area of 186 m\u00b2.<\/figcaption><\/figure><\/li><\/ul><\/figure>\n","protected":false},"author":5,"featured_media":2264,"template":"","meta":{"_acf_changed":false,"editor_notices":[],"footnotes":""},"reference_category":[14],"class_list":["post-2262","reference","type-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/reference\/2262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/types\/reference"}],"author":[{"embeddable":true,"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/users\/5"}],"version-history":[{"count":7,"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/reference\/2262\/revisions"}],"predecessor-version":[{"id":6210,"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/reference\/2262\/revisions\/6210"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/media\/2264"}],"wp:attachment":[{"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/media?parent=2262"}],"wp:term":[{"taxonomy":"reference_category","embeddable":true,"href":"https:\/\/www.haasetank.de\/en\/wp-json\/wp\/v2\/reference_category?post=2262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}